Search a question, state, industry or policy. Results return the relevant original record and reviewed supporting notes—not an invented eligibility answer.
Published: 15 October 2020 · Effective: Not established · Reviewed: 1 November 2026
Read; baseline only, subsequent press notes and FEMA amendments must be checked
Evidence notes, page references and record identity
Reviewed national framework / conditionsEntity, governance and funding An Indian subsidiary/JV company is one available manufacturing structure; LLP eligibility is conditional under FDI rules. MCA uses SPICe+ for company incorporation, and RBI FIRMS supports foreign-investment reporting forms.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 2025 · Effective: Not established · Reviewed: 1 November 2026
Entity/setup sections read; sector-cap chart not relied upon because of inconsistent figures
Evidence notes, page references and record identity
Reviewed national framework / conditionsEntity, governance and funding An Indian subsidiary/JV company is one available manufacturing structure; LLP eligibility is conditional under FDI rules. MCA uses SPICe+ for company incorporation, and RBI FIRMS supports foreign-investment reporting forms.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Official search verified; current filing version must be checked
Evidence notes, page references and record identity
Reviewed national framework / conditionsEntity, governance and funding An Indian subsidiary/JV company is one available manufacturing structure; LLP eligibility is conditional under FDI rules. MCA uses SPICe+ for company incorporation, and RBI FIRMS supports foreign-investment reporting forms.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C04
Web evidence / original unavailableOfficial web evidence — stated scope only
RBI FIRMS reporting portal
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Official portal search verified; detailed current deadlines not verified
Evidence notes, page references and record identity
Reviewed national framework / conditionsEntity, governance and funding An Indian subsidiary/JV company is one available manufacturing structure; LLP eligibility is conditional under FDI rules. MCA uses SPICe+ for company incorporation, and RBI FIRMS supports foreign-investment reporting forms.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C05
Web evidence / original unavailableOfficial web evidence — stated scope only
Income Tax Department: new Act scope and transition FAQ
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 2026 · Effective: Not established · Reviewed: 1 November 2026
Full page read; 2025 Act effective 1 April 2026, earlier tax-year proceedings saved
Evidence notes, page references and record identity
Reviewed national framework / conditionsTax model: use the correct law and year The Income-tax Act 2025 took effect on 1 April 2026; earlier-year matters remain subject to transitional savings. This draft does not validate a current project-specific corporate rate, treaty rate or tax holiday.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C06
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Income-tax Act 2025
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 21 August 2025 · Effective: Not established · Reviewed: 1 November 2026
Official URL found; web fetch 403, local download attempted separately
Evidence notes, page references and record identity
Reviewed national framework / conditionsTax model: use the correct law and year The Income-tax Act 2025 took effect on 1 April 2026; earlier-year matters remain subject to transitional savings. This draft does not validate a current project-specific corporate rate, treaty rate or tax holiday.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C07
Official original PDFOriginal preserved — review scope and conditions below
Published: 2023; current hosted chapter retrieved 2026-11-01 · Effective: Not established · Reviewed: 1 November 2026
Full chapter read; later notifications must also be checked at authorisation
Evidence notes, page references and record identity
Reviewed national framework / conditionsLanded cost and export design DGFT EPCG can support qualifying capital-goods imports against export obligations. Customs systems distinguish EPCG, Advance Authorisation/DFIA, warehousing/MOOWR and origin verification categories. These are separate regimes with different compliance economics.
Reviewed national framework / conditionsEPCG Qualifying capital goods at zero customs duty; IGST/cess treatment subject to revenue notification Generally export obligation 6 times duties/taxes/cess saved within 6 years; average export obligation and actual-user conditions also apply; exceptions/amendments must be checked Authorisation route; hosted FTP chapter states import validity 24 months, no revalidation Core policy verified; project authorisation needed
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 28 October 2026 · Effective: Not established · Reviewed: 1 November 2026
Full release read; application announced 1 November to 31 December 2026; detailed operative guidelines not retrieved
Evidence notes, page references and record identity
Reviewed national framework / conditionsCentral incentives: selective, conditional and time-bound PLI covers specified sectors; it is not a general grant to all foreign investors. Textiles Round 4 is announced for 1 November–31 December 2026 for MMF apparel, MMF fabrics and technical textiles, with revised Part 2 minimum turnover of ₹ 100 crore and Round-4 tenure through FY 2033-34.
Reviewed national framework / conditionsTextiles PLI Round 4 Production-linked incentive subject to approval and qualifying performance; rate/cap not independently verified Round-4 tenure through FY 2033-34; existing Round 1–3 participants may migrate only if no incentive claimed/received and existing applications withdrawn; verify detailed operative amendments Announced open 1 November–31 December 2026; portal functionality not independently tested Official window confirmed; project eligibility unverified
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C09
Web evidence / original unavailableOfficial web evidence — stated scope only
Ministry of Commerce: PLI sectors and investment facilitation
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 27 March 2026 · Effective: Not established · Reviewed: 1 November 2026
Search content verified; not an operative incentive instrument
Evidence notes, page references and record identity
Reviewed national framework / conditionsCentral incentives: selective, conditional and time-bound PLI covers specified sectors; it is not a general grant to all foreign investors. Textiles Round 4 is announced for 1 November–31 December 2026 for MMF apparel, MMF fabrics and technical textiles, with revised Part 2 minimum turnover of ₹ 100 crore and Round-4 tenure through FY 2033-34.
Reviewed national framework / conditionsOther PLI sectors Sector-specific production/sales incentive; no universal rate Check ministry instrument, current round, application deadline, performance thresholds and non-duplication rules Not confirmed open as of 1 November 2026 Framework only; do not count as secured funding
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C10
Web evidence / original unavailableOfficial web evidence — stated scope only
NSWS Know Your Approvals
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Official content verified; indicative approvals only
Evidence notes, page references and record identity
Reviewed national framework / conditionsApprovals and environmental gates NSWS Know Your Approvals helps identify central/state approvals. Scheduled EIA projects beyond applicable thresholds require prior environmental clearance; the project must be screened against current instruments.
Reviewed national framework / conditionsSite diligence: verify the plot, not a state average Infrastructure and approval portals are discovery tools. A state ranking or mapped industrial park is not evidence of a particular plot's deliverable title, services or completion date.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C11
Official original PDFOriginal preserved — review scope and conditions below
Published: 2021-11 · Effective: Not established · Reviewed: 1 November 2026
Historical guide; current portal controls
Evidence notes, page references and record identity
Reviewed national framework / conditionsApprovals and environmental gates NSWS Know Your Approvals helps identify central/state approvals. Scheduled EIA projects beyond applicable thresholds require prior environmental clearance; the project must be screened against current instruments.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 21 November 2025 · Effective: Not established · Reviewed: 1 November 2026
Full release read; implementation stated from 21 November 2025; state-specific rules still require review
Evidence notes, page references and record identity
Reviewed national framework / conditionsWorkforce and expatriate deployment The Ministry of Labour states the four Labour Codes became effective on 21 November 2025. India Visa Online separately identifies business and employment visa categories.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C13
Web evidence / original unavailableOfficial web evidence — stated scope only
India Visa Online visa categories
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Search content verified; direct fetch 502, nationality and purpose-specific conditions not fully checked
Evidence notes, page references and record identity
Reviewed national framework / conditionsWorkforce and expatriate deployment The Ministry of Labour states the four Labour Codes became effective on 21 November 2025. India Visa Online separately identifies business and employment visa categories.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C14
Web evidence / original unavailableOfficial web evidence — stated scope only
PARIVESH environmental clearance instrument index
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Index located; use current EIA notification and amendments for project screening
Evidence notes, page references and record identity
Reviewed national framework / conditionsApprovals and environmental gates NSWS Know Your Approvals helps identify central/state approvals. Scheduled EIA projects beyond applicable thresholds require prior environmental clearance; the project must be screened against current instruments.
Reviewed national framework / conditionsSite diligence: verify the plot, not a state average Infrastructure and approval portals are discovery tools. A state ranking or mapped industrial park is not evidence of a particular plot's deliverable title, services or completion date.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C15
Official original PDFOriginal preserved — review scope and conditions below
Published: 16 November 2010 · Effective: Not established · Reviewed: 1 November 2026
Official text confirms prior EC for scheduled projects beyond thresholds; historical, not consolidated-current law
Evidence notes, page references and record identity
Reviewed national framework / conditionsApprovals and environmental gates NSWS Know Your Approvals helps identify central/state approvals. Scheduled EIA projects beyond applicable thresholds require prior environmental clearance; the project must be screened against current instruments.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 2025 · Effective: Not established · Reviewed: 1 November 2026
Official text identifies EPCG/AA/DFIA, MOOWR, CAROTAR and bank guarantee categories
Evidence notes, page references and record identity
Reviewed national framework / conditionsLanded cost and export design DGFT EPCG can support qualifying capital-goods imports against export obligations. Customs systems distinguish EPCG, Advance Authorisation/DFIA, warehousing/MOOWR and origin verification categories. These are separate regimes with different compliance economics.
Reviewed national framework / conditionsMOOWR / customs bonded manufacturing Evaluate customs-duty deferral and export treatment; not a blanket permanent duty exemption Warehouse permission, bonds, records, domestic clearances and wastage duties; compare compliance cost with financing benefit CBIC 2025 continuation of online facility located; latest 2026 regulations not fully reconciled Candidate structure; current detailed tax treatment unresolved
Reviewed national framework / conditionsAdvance Authorisation / DFIA Potential duty relief; no rate or entitlement quantified in this draft Verify current FTP chapter 4, input-output norms, export obligation, actual user/transferability and latest customs exemption before use Not independently validated Due-diligence lead, not verified eligibility
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C19
Web evidence / original unavailableOfficial web evidence — stated scope only
DPIIT current press note listing
Jurisdictions: India
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 15 March 2026 · Effective: Not established · Reviewed: 1 November 2026
Official document or ministry clarification read in bounded gap-closing pass
Evidence notes, page references and record identity
Reviewed national framework / conditionsFDI: permission before location Press Note 2 (2026), dated 15 March, replaces paragraph 3.1.1 of the FDI policy: the beneficial-owner assessment is at the investor-entity level using PML rules, with cumulative rights and control tests, including ultimate effective control of the Indian investee. Government approval remains required for restricted land-border investors/control. The Ministry confirms the consequential FEMA amendment was notified on 1 May 2026 and that qualifying non-controlling land-border ownership up to 10% can use the automatic route subject to sector conditions and reporting. The 4 May SOP requires that reporting BEFORE inward remittance, or before the relevant transaction where there is no inward remittance. Treat PN 3(2020) as historical, not the current complete rule.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 4 May 2026 · Effective: Not established · Reviewed: 1 November 2026
Official document or ministry clarification read in bounded gap-closing pass
Evidence notes, page references and record identity
Reviewed national framework / conditionsFDI: permission before location Press Note 2 (2026), dated 15 March, replaces paragraph 3.1.1 of the FDI policy: the beneficial-owner assessment is at the investor-entity level using PML rules, with cumulative rights and control tests, including ultimate effective control of the Indian investee. Government approval remains required for restricted land-border investors/control. The Ministry confirms the consequential FEMA amendment was notified on 1 May 2026 and that qualifying non-controlling land-border ownership up to 10% can use the automatic route subject to sector conditions and reporting. The 4 May SOP requires that reporting BEFORE inward remittance, or before the relevant transaction where there is no inward remittance. Treat PN 3(2020) as historical, not the current complete rule.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 21 August 2026 · Effective: Not established · Reviewed: 1 November 2026
Official document or ministry clarification read in bounded gap-closing pass
Evidence notes, page references and record identity
Reviewed national framework / conditionsFDI: permission before location Press Note 2 (2026), dated 15 March, replaces paragraph 3.1.1 of the FDI policy: the beneficial-owner assessment is at the investor-entity level using PML rules, with cumulative rights and control tests, including ultimate effective control of the Indian investee. Government approval remains required for restricted land-border investors/control. The Ministry confirms the consequential FEMA amendment was notified on 1 May 2026 and that qualifying non-controlling land-border ownership up to 10% can use the automatic route subject to sector conditions and reporting. The 4 May SOP requires that reporting BEFORE inward remittance, or before the relevant transaction where there is no inward remittance. Treat PN 3(2020) as historical, not the current complete rule.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C23
Official original PDFOriginal preserved — review scope and conditions below
Published: 23 July 2026 · Effective: Not established · Reviewed: 1 November 2026
Official document or ministry clarification read in bounded gap-closing pass
Evidence notes, page references and record identity
Reviewed national framework / conditions2026 export-only e-commerce change Press Note 3 (2026) concerns export-only inventory e-commerce, not the land-border change. The Ministry confirms an FTP framework through Notification 27/2026-27 and Public Notice 25/2026-27 dated 5 August 2026: registered Exporters-on-Record can handle goods manufactured/produced in India against confirmed overseas orders, with segregated traceable inventory and no domestic diversion.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 5 August 2026 · Effective: Not established · Reviewed: 1 November 2026
Official document or ministry clarification read in bounded gap-closing pass
Evidence notes, page references and record identity
Reviewed national framework / conditions2026 export-only e-commerce change Press Note 3 (2026) concerns export-only inventory e-commerce, not the land-border change. The Ministry confirms an FTP framework through Notification 27/2026-27 and Public Notice 25/2026-27 dated 5 August 2026: registered Exporters-on-Record can handle goods manufactured/produced in India against confirmed overseas orders, with segregated traceable inventory and no domestic diversion.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: C25
Web evidence / original unavailableOfficial web evidence — stated scope only
IBEF Bihar industry profile, April 2026
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Reviewed claim / conditionsGeographic investment lens Eastern Indo-Gangetic plains; proximity to eastern/northern markets. Ocean freight requires an inland leg to ports such as Kolkata/Haldia.
Reviewed claim / conditionsEconomy: estimate, not outturn FY 2025–26 current-price GSDP projected at ₹ 11.07 trillion in the April 2026 profile; latest outturn not verified.
AKHB analysis grounded in cited evidenceFood processing and cold-chain aggregation Agricultural and food/dairy base identified by IBEF. Locate procurement and first-stage processing close to supply; test value-added foods and cold storage against contracted demand. Seasonality, fragmented procurement, food safety, cold-chain loss and inland freight. Proceed only after monthly feedstock mapping, buyer specifications, tested unit yields and reefer quotations.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: BR1
Web evidence / original unavailableOfficial web evidence — stated scope only
NICDC Gaya IMC
Jurisdictions: Bihar, Uttar Pradesh
No local original PDF is available. Use only the limited evidence and status recorded here.
Verified source notePlanned 1670-acre cluster near Dobhi. Published proximity: NH 19 10 km, NH 22 2 km, Gaya Junction 40 km, Gaya airport 30 km, Haldia 550 km, Gaighat 145 km, Fatuha MMLP 130 km, Patna ICD 120 km. These are agency proximity figures, not surveyed routes or service readiness. Location: Connectivity table / project status
AKHB analysis grounded in cited evidencePhased engineering and building-material supply NICDC Gaya IMC near Dobhi: 1,670 acres, NH 19/NH 22 and proximity to Jharkhand; officially described as planned. Evaluate mineral-linked inputs and regional construction demand; phase capex against delivered infrastructure. Land/service delivery milestones and evacuation freight; proposed cluster is not proof of ready serviced plots. Hold construction commitment until plot allotment, utility commissioning and access-road completion are documented.
Reviewed claim / conditionsRoad / river crossings Aunta-Simaria dedicated August 2025; Gaya IMC remains planned Mokama-Aunta-Simaria-Begusarai; Dobhi NH 19/NH 22 Compare north/south Bihar procurement and distribution; Gaya/Dobhi engineering and building-material supplier screening. Raw materials, packaging, machinery and local agricultural inputs by road. Finished goods to regional buyers; drayage to rail, water and seaport gateways. Plot-to-highway access, truck loading restrictions, all-season approach, bridge/axle limits, tolls, backhaul and delivered quotation.
Reviewed claim / conditionsRail / inland terminals EDFC operational to Sonnagar; terminal-specific service and customs status not verified Sonnagar EDFC; Gaya conventional railway; Fatuha MMLP / Patna ICD identified by NICDC Aggregate nonurgent containerised or bulk consignments where volume justifies handling and inventory. Machinery/components or bulk raw materials subject to loading/rake service availability. Domestic northern markets or port-bound conventional-rail connections; no assertion of continuous dedicated line to Kolkata. Written terminal acceptance, train frequency, rake/container availability, first/last mile, free-time/demurrage and customs authority where export/import proposed.
AKHB analysis grounded in cited evidenceLandlocked production creates an inland gateway leg. Consolidate anchor volumes; competitively quote all-road, rail-plus-road and NW 1-plus-road on one delivered-cost basis. Manufacturer procurement/logistics team plus contracted operator. Multi-client consolidation, packaging, warehousing and return-load services around actual customer flows. Signed minimum volumes and service-level agreement; workable inventory/handling cost. Low utilisation or missed vessel/ship connection can eliminate modal savings.
AKHB analysis grounded in cited evidenceA new corridor or industrial cluster may precede ready access and utilities. Stage supplier capacity and capex against plot handover, commissioned power/water and completed approaches. Industrial developer/BIADA for infrastructure; investor for staged procurement and contracts. Engineering/fabrication, maintenance, construction inputs and warehousing that scale with verified cluster demand. Executed customer orders and infrastructure milestones, not employment/investment targets. Developer delays and weak anchor demand.
Verified locations: Connectivity table / project status
Aliases: BR2, UP3, BC2
Official original PDFOriginal preserved — review scope and conditions below
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsWorkforce evidence 26,929 weavers: 4th Handloom Census 2018-19 quoted in 2022 textile policy. Historical sector baseline, not current labour availability.
AKHB analysis grounded in cited evidenceApparel, silk finishing and light footwear Textile 2022 policy identifies Bhagalpur silk and existing weavers; distinguishes garmenting from wet processing. Buyer-led stitching/finishing can exploit craft skills without assuming a complete integrated textile supply chain. Training/quality ramp-up, imported inputs, welfare compliance; wet-processing needs effluent capacity. Shortlist Bhagalpur for silk ecosystem and industrial premises with utilities; obtain buyer trial orders and labour productivity samples.
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsTextile & Leather 2022 — original text, version-sensitive Original §12.3: 15% plant/machinery capital subsidy, cap₹ 10 crore, five equal annual instalments; export freight 30%, cap₹ 10 lakh/year for 5 years. PDFpp 23–24; newer 20%/₹ 20 crore claims NOT adopted without amending order. Category and stacking rules apply. Original 2022 terms verified, current amendments/continuation must be checked before presenting as operative.
Reviewed claim / conditionsTextile 2022 employment and electricity — original text CategoryA: 300% ESI+EPF paid, monthly employee caps₹ 3,000/4,000/5,000 by skill; ₹ 2/unit power subsidy 5 years with annual category caps₹ 2.5/12/35/60/80 lakh. Employment subsidy:≥75% direct employees domiciled Bihar, at least 100 such employees, core staff employed≥1 year. Original classifications may differ from current MSME definition. Original-version evidence only; current application route requires confirmation.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Specified IT Policy 2024 clauses verified; current guidelines, notification chronology and sanction remain conditions. Related AI collection membership does not make this the full AI Policy 2026.
Evidence notes, page references and record identity
AKHB analysis grounded in cited evidencePatna-based IT/ITeS and selective GCC functions Bihar government lists IT 2024 and GCC 2026 policy originals. Pilot back-office/technology delivery where recruitment and service-level performance can be tested before scaling. No demonstrated headcount pipeline or operating GCC economics established in this review; AI policy full text unlocated. Begin with a hiring/retention pilot, dual connectivity and customer contracts; model zero subsidy until eligibility approved.
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsIT Policy 2024 25% annual energy bill reimbursement for five years. 100% employer EPF/ESI reimbursement where applicable, cap ₹ 5000/employee/month for five years. Above ₹ 100 crore investment OR at least 1000 direct on-payroll jobs in state: case-by-case tailored package may be considered. Energy bill includes fixed charges, energy charges and electricity duty; excludes discount/late payment. Not automatic customized grant; SIPB application and sanction required. New/expanding qualifying IT/ITeS/ESDM units subject to policy definitions; existing expansion criteria apply. Five years from notification; exact notification date and all later implementation instructions not reconciled. Original terms verified; current guidelines and sanction remain conditions Location: PDF 18 printed 7 §§7.3–7.5,8.2 PDF 12,14,20
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
AKHB analysis grounded in cited evidencePatna-based IT/ITeS and selective GCC functions Bihar government lists IT 2024 and GCC 2026 policy originals. Pilot back-office/technology delivery where recruitment and service-level performance can be tested before scaling. No demonstrated headcount pipeline or operating GCC economics established in this review; AI policy full text unlocated. Begin with a hiring/retention pilot, dual connectivity and customer contracts; model zero subsidy until eligibility approved.
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsGCC Policy 2026 Separate original policy available,6 pages in existing official-document collection. Test eligible GCC definition, location/headcount thresholds, application timing and stacking; no assumption that all IT units qualify. Document available; detailed benefit eligibility not verified in this research.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: BR5
Official original PDFOriginal preserved — review scope and conditions below
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsBIIPP 2025 — select one route The original capital route gives 30% only to large high-priority units; other categories, regions and ceilings differ. The 300% net-SGST ceiling over 14 years applies to super-mega Region A projects. Capital, special net-SGST and interest-linked routes are alternatives, not three cumulative awards. Original category table: large above ₹ 50 crore to ₹ 200 crore; mega above ₹ 200 crore to ₹ 500 crore; super-mega above ₹ 500 crore. The narrative differs at exactly ₹ 200 crore; seek clarification. Admitted net state GST after input credits, production tests, instalments and caps control cash receipts. Signed extension: until 31 December 2026 or commencement of the successor 2026 policy, whichever is earlier. May 2026 amendment missing; successor commencement not independently ruled out. Original clauses verified; current-version conditions remain unresolved. Location: Original PDF pp.4–9; extension p.1 §3.
Reviewed claim / conditionsBIIPP 2025 alternative routes Capital: large high-priority 30%, priority 25%, non-priority 20%; Region A caps ₹ 40/30/25 crore, Region B ₹ 30/25/20 crore, 10 annual instalments. Mega 22%, cap A 110/B 100 crore, 12 instalments. Super-mega A 25%/B 22%, no monetary cap, 14 instalments. Special net SGST: large A 150%/B 125% of approved project cost over 10 years; mega A 250%/B 200% over 12 years; super-mega A 300%/B 250% over 14 years. Annual caps A 25%/B 20% of approved project cost. Interest route: 10% or actual interest whichever lower; micro/small 12% stated. High-priority cap 50% approved project cost and ₹ 40 crore; priority 30% and ₹ 20 crore; non-priority 15% and ₹ 20 crore; five years. Alongside SGST: high-priority 100% reimbursement up to 100% APC; priority 80% up to 100% APC; non-priority 80% up to 70% APC, five years. One alternative only; one-time choice when incentive application submitted after commencement; no later change. SGST is admitted net state tax after input credits; trading excluded. Table: large >₹ 50 crore to 200; mega >200 to 500; super-mega >500. Narrative capital clause differs at exactly ₹ 200 crore: seek clarification, do not resolve by assumption. Capital from second year requires production >=75% prior-year OR 80% installed capacity, whichever greater; otherwise proportional reduction. Original p 1 deadline 31 March 2026 and implementation milestone 31 March 2027; extension does not expressly revise every milestone. Original route mechanics verified; May 2026 operative amendment not recovered; successor policy commencement not independently ruled out Location: PDF 4 §§4.1–4.2 PDF 5 §4.3 PDF 6–7 §4.4 PDF 7–8 §4.5
Reviewed claim / conditionsBIIPP additional incentives Export: 1% FOB, annual ₹ 40 lakh for 14 years for approved package units, other Export 2024 conditions apply. Environmental: 25% cap ₹ 1 crore for high-priority/priority ETP/ZLD/STP. Employment: 100% ESI/EPF up to ₹ 2000/employee/month for Bihar-domiciled employees, five years, high-priority/priority; textiles governed by their policy. Renewable-energy support is excluded from numerical current advice because the operative original and promotional summary conflict; the May 2026 amendment was not recovered. The inherited skill-support ceiling has not been revalidated. Renewable cap conflict unresolved; exclude numerical current offer Location: PDF 9 §§4.6.1–4.6.4,4.7 PDF 40 Annexure 5
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsBIIPP 2025 — select one route The original capital route gives 30% only to large high-priority units; other categories, regions and ceilings differ. The 300% net-SGST ceiling over 14 years applies to super-mega Region A projects. Capital, special net-SGST and interest-linked routes are alternatives, not three cumulative awards. Original category table: large above ₹ 50 crore to ₹ 200 crore; mega above ₹ 200 crore to ₹ 500 crore; super-mega above ₹ 500 crore. The narrative differs at exactly ₹ 200 crore; seek clarification. Admitted net state GST after input credits, production tests, instalments and caps control cash receipts. Signed extension: until 31 December 2026 or commencement of the successor 2026 policy, whichever is earlier. May 2026 amendment missing; successor commencement not independently ruled out. Original clauses verified; current-version conditions remain unresolved. Location: Original PDF pp.4–9; extension p.1 §3.
Reviewed claim / conditionsBIIPP 2025 alternative routes Capital: large high-priority 30%, priority 25%, non-priority 20%; Region A caps ₹ 40/30/25 crore, Region B ₹ 30/25/20 crore, 10 annual instalments. Mega 22%, cap A 110/B 100 crore, 12 instalments. Super-mega A 25%/B 22%, no monetary cap, 14 instalments. Special net SGST: large A 150%/B 125% of approved project cost over 10 years; mega A 250%/B 200% over 12 years; super-mega A 300%/B 250% over 14 years. Annual caps A 25%/B 20% of approved project cost. Interest route: 10% or actual interest whichever lower; micro/small 12% stated. High-priority cap 50% approved project cost and ₹ 40 crore; priority 30% and ₹ 20 crore; non-priority 15% and ₹ 20 crore; five years. Alongside SGST: high-priority 100% reimbursement up to 100% APC; priority 80% up to 100% APC; non-priority 80% up to 70% APC, five years. One alternative only; one-time choice when incentive application submitted after commencement; no later change. SGST is admitted net state tax after input credits; trading excluded. Table: large >₹ 50 crore to 200; mega >200 to 500; super-mega >500. Narrative capital clause differs at exactly ₹ 200 crore: seek clarification, do not resolve by assumption. Capital from second year requires production >=75% prior-year OR 80% installed capacity, whichever greater; otherwise proportional reduction. Original p 1 deadline 31 March 2026 and implementation milestone 31 March 2027; extension does not expressly revise every milestone. Original route mechanics verified; May 2026 operative amendment not recovered; successor policy commencement not independently ruled out Location: PDF 4 §§4.1–4.2 PDF 5 §4.3 PDF 6–7 §4.4 PDF 7–8 §4.5
Reviewed claim / conditionsBIIPP validity extension Until 31 December 2026 OR commencement of new Industrial Investment Promotion Policy 2026, whichever earlier. The signed departmental extension is the controlling evidence reviewed. Current index still links extension but does not prove no later successor. Extension text verified; current successor trigger unresolved Location: PDF 1 §3
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsAdditional sector routes Logistics 2024; Export 2024; Tourism policy and guidelines; Biofuels 2023; Sugarcane 2026. Use relevant original for project type. Sector schemes do not automatically stack; legacy 2016 policy must be read with amendments and 2025 package. Current government index lists originals; full entitlement audit still project-specific.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: BRINDEX, BRV8
Official original PDFOriginal preserved — review scope and conditions below
Reviewed claim / conditionsGeographic investment lens Eastern Indo-Gangetic plains; proximity to eastern/northern markets. Ocean freight requires an inland leg to ports such as Kolkata/Haldia.
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Current amendment overrides earlier guideline wordingApplications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. Location: English PDF pp 3–5, clausesB–J
Reviewed claim / conditionsUNNATI 2024 — April 2026 amendment Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. ClauseC substitutes application deadline 30 September 2026. ClauseD substitutes grant-of-registration deadline 31 March 2027. Grant deadline is not permission for fresh applications after application deadline. No fresh opening established as of 1 November 2026. Applications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. Location: English PDF pp 3–5, clausesB–J
Reviewed national framework / conditionsUNNATI 2024 — April 2026 amendment Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. ClauseC substitutes application deadline 30 September 2026. ClauseD substitutes grant-of-registration deadline 31 March 2027. Grant deadline is not permission for fresh applications after application deadline. No fresh opening established as of 1 November 2026. Applications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. Location: English PDF pp 3–5, clausesB–J
Verified locations: See policy/profile notes. Download validity does not verify claims.
Published: September 2025 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteAunta-Simaria NH 31 four/six-lane section and six-lane Ganga bridge dedicated 22 August 2025. Operational crossing evidence; a corridor announcement is not a site-to-gateway delivery guarantee. Location: PDF p 5
Reviewed claim / conditionsRoad / river crossings Aunta-Simaria dedicated August 2025; Gaya IMC remains planned Mokama-Aunta-Simaria-Begusarai; Dobhi NH 19/NH 22 Compare north/south Bihar procurement and distribution; Gaya/Dobhi engineering and building-material supplier screening. Raw materials, packaging, machinery and local agricultural inputs by road. Finished goods to regional buyers; drayage to rail, water and seaport gateways. Plot-to-highway access, truck loading restrictions, all-season approach, bridge/axle limits, tolls, backhaul and delivered quotation.
AKHB analysis grounded in cited evidenceA new corridor or industrial cluster may precede ready access and utilities. Stage supplier capacity and capex against plot handover, commissioned power/water and completed approaches. Industrial developer/BIADA for infrastructure; investor for staged procurement and contracts. Engineering/fabrication, maintenance, construction inputs and warehousing that scale with verified cluster demand. Executed customer orders and infrastructure milestones, not employment/investment targets. Developer delays and weak anchor demand.
Verified locations: PDF p 5
Aliases: BC1
Web evidence / original unavailableOfficial web evidence — stated scope only
Railways 2026 parliamentary reply on DFC commissioning
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 2026 parliamentary reply · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteCompleted EDFC is Ludhiana-Sonnagar, 1337 km; WDFC JNPT-Dadri 1506 km also stated commissioned. Dankuni-Surat is announced/DPR preparation, not commissioned. Do not extend the operational EDFC line to Kolkata on a map. Location: Dedicated freight corridor subsection
Reviewed claim / conditionsRail / inland terminals EDFC operational to Sonnagar; terminal-specific service and customs status not verified Sonnagar EDFC; Gaya conventional railway; Fatuha MMLP / Patna ICD identified by NICDC Aggregate nonurgent containerised or bulk consignments where volume justifies handling and inventory. Machinery/components or bulk raw materials subject to loading/rake service availability. Domestic northern markets or port-bound conventional-rail connections; no assertion of continuous dedicated line to Kolkata. Written terminal acceptance, train frequency, rake/container availability, first/last mile, free-time/demurrage and customs authority where export/import proposed.
AKHB analysis grounded in cited evidenceLandlocked production creates an inland gateway leg. Consolidate anchor volumes; competitively quote all-road, rail-plus-road and NW 1-plus-road on one delivered-cost basis. Manufacturer procurement/logistics team plus contracted operator. Multi-client consolidation, packaging, warehousing and return-load services around actual customer flows. Signed minimum volumes and service-level agreement; workable inventory/handling cost. Low utilisation or missed vessel/ship connection can eliminate modal savings.
Published: 15 February 2024 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteNorth-bank Saran terminal inaugurated; NH 19 access and Nepal-bound routing via Raxaul identified. 77000 TEU/year is designed capacity, not actual traffic. Location: Kalughat paragraphs
Reviewed claim / conditionsInland water / outbound sea gateway Kalughat inaugurated and handed to operator; Haldia cargo commencement established; regular service quote unverified Kalughat-Saran on NW 1; Gaighat-Patna; downstream Kolkata/Haldia Container aggregation and low urgency replenishment; assess suitable cargo with actual operator, not generic cheapest-mode promise. Port-origin containers/components to northern Bihar or Nepal hinterland, then road distribution. Aggregated export/domestic container cargo to downstream gateway if booked service and maritime connection align. Container/cargo acceptance, LAD and draft, sailing window, vessel/yard capacity, transshipment charges, port cut-offs, damage insurance and return loads.
Verified locations: Kalughat paragraphs
Aliases: BC4
Web evidence / original unavailableOfficial web evidence — stated scope only
Intermodal connectivity parliamentary answer
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 28 March 2025 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteKalughat construction complete for north Bihar/Nepal traffic. Annexure separates forecast from physical capacity and says container-only handling was selected because of space; berth/yard govern throughput. NW 1 terminals integrated with Kolkata port. Do not use its forecast as actual Kalughat demand. Location: Annexure 1 and integration paragraph
Reviewed claim / conditionsInland water / outbound sea gateway Kalughat inaugurated and handed to operator; Haldia cargo commencement established; regular service quote unverified Kalughat-Saran on NW 1; Gaighat-Patna; downstream Kolkata/Haldia Container aggregation and low urgency replenishment; assess suitable cargo with actual operator, not generic cheapest-mode promise. Port-origin containers/components to northern Bihar or Nepal hinterland, then road distribution. Aggregated export/domestic container cargo to downstream gateway if booked service and maritime connection align. Container/cargo acceptance, LAD and draft, sailing window, vessel/yard capacity, transshipment charges, port cut-offs, damage insurance and return loads.
AKHB analysis grounded in cited evidenceLandlocked production creates an inland gateway leg. Consolidate anchor volumes; competitively quote all-road, rail-plus-road and NW 1-plus-road on one delivered-cost basis. Manufacturer procurement/logistics team plus contracted operator. Multi-client consolidation, packaging, warehousing and return-load services around actual customer flows. Signed minimum volumes and service-level agreement; workable inventory/handling cost. Low utilisation or missed vessel/ship connection can eliminate modal savings.
AKHB analysis grounded in cited evidenceInland-water payload and dispatch reliability depend on channel depth and service availability. Book season-specific draft/dispatch plan, aggregate cargo, carry buffer inventory and keep priced road/rail fallback. Terminal/vessel operator and anchor shippers; IWAI manages navigation information. Scheduled aggregation and inventory-management service for nonurgent goods. Demonstrated departures and handling/cargo acceptance; no project finance based only on theoretical terminal capacity. Waterway seasonality and insufficient backhaul remain.
Verified locations: Annexure 1 and integration paragraph
Aliases: BC5
Web evidence / original unavailableOfficial web evidence — stated scope only
Kalughat operator handover and Haldia cargo commencement
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 7 November 2025 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteKalughat handed to SAPL for operation/maintenance. Haldia MMT commenced cargo operations with a shipment to Pandu. This does not establish a scheduled Kalughat-Haldia service or a current quote; the release broadens cargo wording beyond the earlier container-only specification, requiring operator cargo-acceptance confirmation. Location: Kalughat and Haldia subsections
Reviewed claim / conditionsInland water / outbound sea gateway Kalughat inaugurated and handed to operator; Haldia cargo commencement established; regular service quote unverified Kalughat-Saran on NW 1; Gaighat-Patna; downstream Kolkata/Haldia Container aggregation and low urgency replenishment; assess suitable cargo with actual operator, not generic cheapest-mode promise. Port-origin containers/components to northern Bihar or Nepal hinterland, then road distribution. Aggregated export/domestic container cargo to downstream gateway if booked service and maritime connection align. Container/cargo acceptance, LAD and draft, sailing window, vessel/yard capacity, transshipment charges, port cut-offs, damage insurance and return loads.
AKHB analysis grounded in cited evidenceInland-water payload and dispatch reliability depend on channel depth and service availability. Book season-specific draft/dispatch plan, aggregate cargo, carry buffer inventory and keep priced road/rail fallback. Terminal/vessel operator and anchor shippers; IWAI manages navigation information. Scheduled aggregation and inventory-management service for nonurgent goods. Demonstrated departures and handling/cargo acceptance; no project finance based only on theoretical terminal capacity. Waterway seasonality and insufficient backhaul remain.
Verified locations: Kalughat and Haldia subsections
Aliases: BC6
Web evidence / original unavailableOfficial web evidence — stated scope only
IWAI Least Available Depth
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Live official page checked 1 November 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteLAD controls vessel draft, payload, routing and seasonal feasibility; obtain voyage-specific LAD/river notices rather than assume year-round full-load movement. Location: Introduction / linked river notices
Reviewed claim / conditionsInland water / outbound sea gateway Kalughat inaugurated and handed to operator; Haldia cargo commencement established; regular service quote unverified Kalughat-Saran on NW 1; Gaighat-Patna; downstream Kolkata/Haldia Container aggregation and low urgency replenishment; assess suitable cargo with actual operator, not generic cheapest-mode promise. Port-origin containers/components to northern Bihar or Nepal hinterland, then road distribution. Aggregated export/domestic container cargo to downstream gateway if booked service and maritime connection align. Container/cargo acceptance, LAD and draft, sailing window, vessel/yard capacity, transshipment charges, port cut-offs, damage insurance and return loads.
AKHB analysis grounded in cited evidenceLandlocked production creates an inland gateway leg. Consolidate anchor volumes; competitively quote all-road, rail-plus-road and NW 1-plus-road on one delivered-cost basis. Manufacturer procurement/logistics team plus contracted operator. Multi-client consolidation, packaging, warehousing and return-load services around actual customer flows. Signed minimum volumes and service-level agreement; workable inventory/handling cost. Low utilisation or missed vessel/ship connection can eliminate modal savings.
AKHB analysis grounded in cited evidenceInland-water payload and dispatch reliability depend on channel depth and service availability. Book season-specific draft/dispatch plan, aggregate cargo, carry buffer inventory and keep priced road/rail fallback. Terminal/vessel operator and anchor shippers; IWAI manages navigation information. Scheduled aggregation and inventory-management service for nonurgent goods. Demonstrated departures and handling/cargo acceptance; no project finance based only on theoretical terminal capacity. Waterway seasonality and insufficient backhaul remain.
Verified locations: Introduction / linked river notices
Aliases: BC7
Web evidence / original unavailableOfficial web evidence — stated scope only
MoCA 2023 year-end review air cargo
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 2023 year-end review · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteDomestic regulated-agent operations at Darbhanga began 19 May 2023; airline self-handling for outbound cargo at Patna 23 May 2023 and Gaya 12 July 2023. Historical commissioning evidence, not current flight capacity or international customs-service proof. Location: Air Cargo subsection
Reviewed claim / conditionsAir / people and time-critical cargo Airport/cargo functions differ; Bihta foundation-stage evidence only Patna, Gaya, Darbhanga; Purnea passenger terminal; Bihta development Management/customer travel; high-value samples, urgent spares and qualifying perishables where airline acceptance and economics work. Urgent parts or samples via accepted domestic hub connection. Domestic air cargo / onward gateway only after booking; do not portray international flight label as routine international cargo capability. Current airline timetable, destination and belly capacity, cut-off, dimensions/dangerous-goods acceptance, cold room, screening and customs/plant quarantine for proposed shipment.
AKHB analysis grounded in cited evidencePassenger airport access does not by itself provide export cold-chain or cargo capacity. Pre-book airline capacity, pre-cool/pack at origin, test temperature log and claim process, compare road-to-gateway fallback. Producer/exporter, approved packhouse, airline/handler and relevant inspecting agencies. Buyer-led packhouse, testing, reefer transfer and high-value cargo coordination. Product-specific acceptance, shelf life and contracted buyer price support full logistics cost. Offload, seasonal air capacity and product rejection.
Verified locations: Air Cargo subsection
Aliases: BC8
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
MoCA annual report 2025-26
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 2025-26 report; event tables primarily 2025 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source notePatna new terminal inaugurated 29 May 2025; Bihta foundation laid same date; Purnea interim terminal inaugurated 15 September 2025. Darbhanga existing terminal expansion completed August 2025. Distinguish passenger infrastructure from cargo capability; Bihta foundation is not operational status. Location: PDF p 137 / printed p 135; p 138 / printed p 136
Reviewed claim / conditionsAir / people and time-critical cargo Airport/cargo functions differ; Bihta foundation-stage evidence only Patna, Gaya, Darbhanga; Purnea passenger terminal; Bihta development Management/customer travel; high-value samples, urgent spares and qualifying perishables where airline acceptance and economics work. Urgent parts or samples via accepted domestic hub connection. Domestic air cargo / onward gateway only after booking; do not portray international flight label as routine international cargo capability. Current airline timetable, destination and belly capacity, cut-off, dimensions/dangerous-goods acceptance, cold room, screening and customs/plant quarantine for proposed shipment.
AKHB analysis grounded in cited evidencePassenger airport access does not by itself provide export cold-chain or cargo capacity. Pre-book airline capacity, pre-cool/pack at origin, test temperature log and claim process, compare road-to-gateway fallback. Producer/exporter, approved packhouse, airline/handler and relevant inspecting agencies. Buyer-led packhouse, testing, reefer transfer and high-value cargo coordination. Product-specific acceptance, shelf life and contracted buyer price support full logistics cost. Offload, seasonal air capacity and product rejection.
Verified locations: PDF p 137 / printed p 135; p 138 / printed p 136
Aliases: BC9
Web evidence / original unavailableOfficial web evidence — stated scope only
LPAI Raxaul land port
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Live page checked 1 November 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteRaxaul-Birgunj bilateral/third-country trade gateway; listed export/import warehouses, customs, weighbridges, quarantine and cold-storage area. Facility listing is not certified usable capacity or product clearance. Location: Port overview and facilities
Reviewed claim / conditionsLand-border exports Operating LPAI ports; cargo-specific clearance and capacity remain project tests Raxaul; Jogbani Nepal-focused food, industrial inputs, packaging and machinery distribution only with actual buyers and trade compliance. Approved raw materials/inputs across border if product origin and tariff treatment support case. Industrial goods to Nepal via contracted buyers and authorised customs route. Importer credentials, HS classification, origin rules, SPS/quarantine, truck interchange/parking, border dwell, warehouse/cold-chain acceptance and settlement risk.
AKHB analysis grounded in cited evidenceBorder trade adds documentation, inspection and dwell-time uncertainty. Use approved broker/forwarder, pre-validate product/origin paperwork and contract border handling with measured pilot loads. Exporter/importer, authorised logistics operator and customs/quarantine authorities. Compliant Nepal-market distribution, consolidation and inventory positioning. Verified Nepal demand and lawful trade route; no automatic preferential tariff assumption. Border disruption, buyer credit and product restrictions.
Verified locations: Port overview and facilities
Aliases: BC10
Web evidence / original unavailableOfficial web evidence — stated scope only
LPAI Jogbani land port
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Live page checked 1 November 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteOperational border land port inaugurated 26 February 2019; warehouses, customs, quarantine and weighbridges listed. Page spells counterpart Biratgunj; avoid repeating inconsistent counterpart name without reconciliation. Location: Overview and facilities
Reviewed claim / conditionsLand-border exports Operating LPAI ports; cargo-specific clearance and capacity remain project tests Raxaul; Jogbani Nepal-focused food, industrial inputs, packaging and machinery distribution only with actual buyers and trade compliance. Approved raw materials/inputs across border if product origin and tariff treatment support case. Industrial goods to Nepal via contracted buyers and authorised customs route. Importer credentials, HS classification, origin rules, SPS/quarantine, truck interchange/parking, border dwell, warehouse/cold-chain acceptance and settlement risk.
AKHB analysis grounded in cited evidenceBorder trade adds documentation, inspection and dwell-time uncertainty. Use approved broker/forwarder, pre-validate product/origin paperwork and contract border handling with measured pilot loads. Exporter/importer, authorised logistics operator and customs/quarantine authorities. Compliant Nepal-market distribution, consolidation and inventory positioning. Verified Nepal demand and lawful trade route; no automatic preferential tariff assumption. Border disruption, buyer credit and product restrictions.
Verified locations: Overview and facilities
Aliases: BC11
Web evidence / original unavailableOfficial web evidence — stated scope only
IWAI CAR-D traffic portal
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Live official page checked 1 November 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteOfficial portal provides commodity, terminal and waterway cargo data. No terminal-level Kalughat actual volume was extracted in this review. Location: Portal description
Verified locations: Portal description
Aliases: BC12
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Bihar EODB Act 2026
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 16 September 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteAct 32 commencement on publication. CIPA 5/10/15 working days, three-year prescribed-service cover, regular approvals by expiry; land-use and safety exclusions continue. Section 2(i) excludes silence-based safety/environment/labour-welfare approval unless governing law allows; thirty-day nonresponse escalates. Location: PDF pp 30-31,43-44,46,50,61-62
Reviewed claim / conditionsEase of Doing Business / optional CIPA CIPA categories carry 5 / 10 / 15 working-day processing periods for prescribed services. The temporary certificate route provides three years to obtain regular approvals as prescribed. Valid registrations can support limited duplicate-licence relief for the same activity and premises. Land, environment, fire, building, labour and safety obligations continue. The 30-day escalation route is not automatic clearance. Confirm service coverage, complete filing, category and portal status; a CIPA is not universal permission to construct or operate. Key Act and notification clauses checked; complete later-rule and portal-operation audit not performed. Location: Act PDF pp.30–31,43–44,46,50,61–62; notification 2496 PDF pp.2–3.
Verified locations: PDF pp 30-31,43-44,46,50,61-62
Aliases: BC13
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Notification 2495 duplicate licensing
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 9 October 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteGives effect to section 27/ScheduleVII duplicate recognition; matched activity, premises and continuing substantive duties matter. Location: PDF pp 1-3
Reviewed claim / conditionsEase of Doing Business / optional CIPA CIPA categories carry 5 / 10 / 15 working-day processing periods for prescribed services. The temporary certificate route provides three years to obtain regular approvals as prescribed. Valid registrations can support limited duplicate-licence relief for the same activity and premises. Land, environment, fire, building, labour and safety obligations continue. The 30-day escalation route is not automatic clearance. Confirm service coverage, complete filing, category and portal status; a CIPA is not universal permission to construct or operate. Key Act and notification clauses checked; complete later-rule and portal-operation audit not performed. Location: Act PDF pp.30–31,43–44,46,50,61–62; notification 2496 PDF pp.2–3.
Verified locations: PDF pp 1-3
Aliases: BC14
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Notification 2496 CIPA/MSME route
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 9 October 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteRecites 5/10/15-day Act timetable; operative paragraph 12 expressly MSMEs self-declaration CIPA with three-year inspection protection subject to sections 16/28. Does not establish all live portal services. Location: PDF pp 2-3
Reviewed claim / conditionsEase of Doing Business / optional CIPA CIPA categories carry 5 / 10 / 15 working-day processing periods for prescribed services. The temporary certificate route provides three years to obtain regular approvals as prescribed. Valid registrations can support limited duplicate-licence relief for the same activity and premises. Land, environment, fire, building, labour and safety obligations continue. The 30-day escalation route is not automatic clearance. Confirm service coverage, complete filing, category and portal status; a CIPA is not universal permission to construct or operate. Key Act and notification clauses checked; complete later-rule and portal-operation audit not performed. Location: Act PDF pp.30–31,43–44,46,50,61–62; notification 2496 PDF pp.2–3.
Verified locations: PDF pp 2-3
Aliases: BC15
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Notification 2497 single nodal agency
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: 9 October 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteSingle nodal agency through Invest Bihar; retain supporting detailed EODB guide rather than omit approval coordination. Location: PDF pp 1-2
Reviewed claim / conditionsEase of Doing Business / optional CIPA CIPA categories carry 5 / 10 / 15 working-day processing periods for prescribed services. The temporary certificate route provides three years to obtain regular approvals as prescribed. Valid registrations can support limited duplicate-licence relief for the same activity and premises. Land, environment, fire, building, labour and safety obligations continue. The 30-day escalation route is not automatic clearance. Confirm service coverage, complete filing, category and portal status; a CIPA is not universal permission to construct or operate. Key Act and notification clauses checked; complete later-rule and portal-operation audit not performed. Location: Act PDF pp.30–31,43–44,46,50,61–62; notification 2496 PDF pp.2–3.
Verified locations: PDF pp 1-2
Aliases: BC16
Official original PDFOriginal preserved — review scope and conditions below
Published: Official upload 27 August 2026 · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Verified source noteOriginal downloaded and parse-checked. The route-level reference is retained; all numerical terms in the dated brochure have not been independently reverified. Location: 119-page scanned original; clauses not independently reread
Reviewed claim / conditionsBIADA land and post-allotment framework EMD 2% land lease premium micro/small; 5% medium/large. Bihar-registered startups may be exempt. Balance instalments carry 9% simple annual interest. Default: 12% annually on defaulted amount for period of default. Production/operations from possession: 18/24/30/36 months micro/small/medium/large. Complete defect-free specified post-allotment applications: 30 working days deemed approval, subject to exclusions. Do not add 9%+12%; clause 19.2 does not expressly say additive. Default can lead to cancellation. Upfront payment within 30 days of allotment letter after EMD adjustment, with taxes. Lease 30/60/90 years as-is-where-is and allotment-specific. Deemed approval limited to ScheduleIV: not fresh land allotment; ownership/control transfer; mandatory mortgage NOC; Red/Orange pollution approvals; cancellation/restoration/resumption; title/encroachment/litigation; statutory approvals outside BIADA competence. Transfer/NOC delay triggers Board placement, not automatic clearance. Fire/environment/building and other statutory compliance remains. Original 2026 clauses verified; later amendments not exhaustively audited Location: PDF 15 printed 13 §§12.2–12.3 PDF 17 §§17.1,18.1 PDF 18 printed 16 §§19.1–19.2 PDF 21 printed 19 §§23.3,24.1–24.4 PDF 22 printed 20 §§26.1–26.2
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsBIIPP additional incentives Export: 1% FOB, annual ₹ 40 lakh for 14 years for approved package units, other Export 2024 conditions apply. Environmental: 25% cap ₹ 1 crore for high-priority/priority ETP/ZLD/STP. Employment: 100% ESI/EPF up to ₹ 2000/employee/month for Bihar-domiciled employees, five years, high-priority/priority; textiles governed by their policy. Renewable-energy support is excluded from numerical current advice because the operative original and promotional summary conflict; the May 2026 amendment was not recovered. The inherited skill-support ceiling has not been revalidated. Renewable cap conflict unresolved; exclude numerical current offer Location: PDF 9 §§4.6.1–4.6.4,4.7 PDF 40 Annexure 5
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsTourism policy amended guidelines Capital subsidy: project cost up to ₹ 10 crore 30%, cap 3 crore; next tier up to 50 crore 25%, cap 10 crore; above 50 crore 25%, cap 25 crore. Alternatively interest subsidy: 10% or actual term-loan rate whichever lower, maximum five years; same total project caps. Capital OR interest, not both. Capital release 50% at commercial operations,25% after 2 years,25% after 5 years. Eligible tourism category, minimum investment/star standards and sanction apply. Exact amendment date not established. Original amended guidelines verified; project eligibility and current sanction required Location: PDF 24 printed 20 §7.3(A) PDF 25 printed 21
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsStartup 2022 seed support Up to ₹ 10 lakh as ten-year interest-free loan, repayable after ten years. Despite Seed Grant heading, operative clause calls it loan. Rating-agency assessment, milestones/performance and startup eligibility control amount/release; not automatic incorporation benefit. Policy five years from notification; exact notification date unresolved. Original loan nature verified; current approval/window not independently verified Location: PDF 36 printed 11 §12.5.1 PDF 26 §3
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsSector routes and supplier ecosystem Textiles: original 2022 capital, power, employment and freight clauses remain version-sensitive. IT 2024: original 25% annual energy-bill support and employer EPF/ESI support capped at ₹ 5,000 per employee/month, for five years, apply only to qualifying units. IT sanction and current instructions remain necessary. Tourism uses capital OR interest support. Startup seed support is a repayable ten-year interest-free loan. Udyami is a beneficiary-restricted local entrepreneur route, not a blanket FDI benefit. GCC 2026 has a separate eligibility test. Detailed terms, caps, source pages and gaps are in the linked Bihar policy companion.
Reviewed claim / conditionsMukhyamantri Udyami Eligible project cost up to ₹ 10 lakh: 50% subsidy capped ₹ 5 lakh plus 50% loan capped ₹ 5 lakh; loan interest-free except Yuva 1% annually. Beneficiary category, selection and application window matter. Not a blanket international-industrial investor incentive. Current open window not verified. Current official overview verified; application window unresolved Location: Official About Us webpage
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: BRV6
Web evidence / original unavailableOriginal unavailable locally; limited evidence only
Bihar Industries Department current policy index
Jurisdictions: Bihar
No local original PDF is available. Use only the limited evidence and status recorded here.
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Reviewed claim / conditionsBIIPP validity extension Until 31 December 2026 OR commencement of new Industrial Investment Promotion Policy 2026, whichever earlier. The signed departmental extension is the controlling evidence reviewed. Current index still links extension but does not prove no later successor. Extension text verified; current successor trigger unresolved Location: PDF 1 §3
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Aliases: BRV7
Official original PDFLatest verified amendment — fresh applications closed
UNNATI 2024 — operative amendment notified 1 April 2026
Published: Not established · Effective: Not established · Reviewed: 1 November 2026
Only the cited claims are reviewed; file availability does not establish eligibility.
Evidence notes, page references and record identity
Current amendment overrides earlier guideline wordingApplications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. Location: English PDF pp 3–5, clausesB–J
Reviewed claim / conditionsUNNATI 2024 — April 2026 amendment Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. ClauseC substitutes application deadline 30 September 2026. ClauseD substitutes grant-of-registration deadline 31 March 2027. Grant deadline is not permission for fresh applications after application deadline. No fresh opening established as of 1 November 2026. Applications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. Location: English PDF pp 3–5, clausesB–J
Reviewed national framework / conditionsUNNATI 2024 — April 2026 amendment Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026. ClausesF andJ replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. These omitted categories are not current UNNATI-eligible sectors. ClauseG amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. ClauseE addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. ClauseH addresses multiple GST registrations,₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Earlier vested benefits are not automatically denied retrospectively. Review registration date, sanction and transition position individually. ClauseC substitutes application deadline 30 September 2026. ClauseD substitutes grant-of-registration deadline 31 March 2027. Grant deadline is not permission for fresh applications after application deadline. No fresh opening established as of 1 November 2026. Applications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline. Location: English PDF pp 3–5, clausesB–J
Exact page/clause location is not recorded for every claim; do not infer a full-document review.
Published: 4 October 2026 · Effective: Not established · Reviewed: 1 November 2026
Page 2 renewable headline conflicts with the operative original; do not rely on it as a current offer.
Evidence notes, page references and record identity
Material correctionCorrection to the archived 4 October 2026 investment guide, page 2: its ₹ 1 crore renewable-support ceiling matches a promotional summary but conflicts with the operative package, PDF page 9 §4.6.4 and page 40 Annexure 5, which state ₹ 6 lakh. The May 2026 amendment was not recovered. Neither amount is presented as a reconciled current offer. Original bytes are preserved; the new companion excludes a numerical renewable offer. Location: Archived guide p.2; operative package pp.9,40
Exact page/clause location is not recorded for every claim; do not infer a full-document review.