Capital
Dispur

Industrial investment and policy for Viksit Bharat 2047. Evidence reviewed as of 1 November 2026; document dates and unresolved gaps remain explicit.
Read or download investor brochure
Dispur
78, 438 (MHA reference; not available industrial land)
Brahmaputra and Barak valleys; Arunachal Pradesh, Nagaland, Manipur, Mizoram, Tripura, Meghalaya, West Bengal; Bhutan and Bangladesh.
Official geographic context, resized; original source retained. AS03
Evidence. Mo FPI identifies rice/spice resources
Commercial case. Mo FPI identifies rice/spice resources; tested traceable lots can serve ingredient buyers.
Exposure. Varietal consistency and seasonal procurement.
Investment gate. Crop contracts, food-safety testing and buyer approval.
Evidence. Mo FPI describes food infrastructure
Commercial case. Mo FPI describes food infrastructure; packaging can serve contracted processors.
Exposure. Input freight and weak order density.
Investment gate. Customer-specific annual demand and material landed cost.
Evidence. IWAI describes Pandu infrastructure and airport operator describes cargo facilities
Commercial case. IWAI describes Pandu infrastructure and airport operator describes cargo facilities; select modes against actual bookings.
Exposure. Draft, schedules and border permissions.
Investment gate. Door-to-door quotations and booked carriers.
Status. Candidate geography; no vacant serviced-plot claim.
Route or node. Guwahati-Chaygaon; Assam-West Bengal routing
Assessment. Candidate domestic freight routing; site-level access and costs not assessed.
Incoming outgoing relevance. test delivery of machinery, packaging and other purchased inputs inward, and the profile’s proposed processed products outward; no volume or booked service is assumed.
Asset service status. Candidate domestic freight routing; site-level access and costs not assessed.
Remaining gap. Flood exposure, loading limits, transit time, truck supply and firm quotations.
Route or node. Pandu terminal rail connection
Assessment. IWAI documents terminal connectivity; a siding does not guarantee a scheduled service for the investor.
Incoming outgoing relevance. test delivery of machinery, packaging and other purchased inputs inward, and the profile’s proposed processed products outward; no volume or booked service is assumed.
Asset service status. IWAI documents terminal connectivity; a siding does not guarantee a scheduled service for the investor.
Remaining gap. Handling operator, wagon/container service, minimum lot and interchange charges.
Route or node. Guwahati airport cargo facilities
Assessment. Operator describes cargo handling; expansion is described as upcoming.
Incoming outgoing relevance. potential urgent spares, samples and suitable high-value/perishable consignments; bulk freight economics and carrier acceptance are unverified.
Asset service status. Operator describes cargo handling; expansion is described as upcoming.
Remaining gap. Commodity acceptance, capacity, flight availability and door-to-door charges.
Route or node. NW-2 Brahmaputra; Pandu
Assessment. IWAI documents terminal infrastructure and maintained-depth targets; targets are not guaranteed sailing drafts.
Incoming outgoing relevance. consider only suitable loads with a verified terminal/vessel chain; compare transfer and inventory costs for inbound inputs and outbound products.
Asset service status. IWAI documents terminal infrastructure and maintained-depth targets; targets are not guaranteed sailing drafts.
Remaining gap. Actual sailing schedule, draft, vessel capacity, seasonal restrictions and protocol permissions where applicable.
Route or node. West Bengal seaport routing; Bangladesh protocol route where authorized
Assessment. Indian routing must be priced; Bangladesh protocol movement requires current permissions and booked services.
Incoming outgoing relevance. test delivery of machinery, packaging and other purchased inputs inward, and the profile’s proposed processed products outward; no volume or booked service is assumed.
Asset service status. Indian routing must be priced; Bangladesh protocol movement requires current permissions and booked services.
Remaining gap. Chosen port/terminal, customs compliance, through-carrier contract and transit time.
Benefits. Conditional routes only; unverified current rates excluded.
Conditions. Extends Industrial and Investment Policy of Assam 2019 from 1 September 2024 until further notifications. Official ASIDC PDF text indexed by web search. Direct retrieval returned 404, as did three alternate official-host attempts. This is indexed-original text evidence, NOT a downloaded original or fully reconciled current policy.
Status. Indexed official extension text; local original unavailable, current consolidated entitlement not verified.
Benefits. No additional unverified entitlement stated.
Conditions. Logistics/warehousing policy is listed in official EODB index; operative original and current rules remain a gap. No benefit rate or open application window asserted.
Status. Component or retrieval gap as specified.
Benefits. Capital, interest and manufacturing-linked mechanisms remain subject to approval. No fresh application window is established at 1 November 2026.
Window. Clause C substitutes application deadline 30 September 2026. Clause D substitutes grant-of-registration deadline 31 March 2027. Grant deadline is not permission for fresh applications after application deadline. No fresh opening established as of 1 November 2026.
Conditions. Clauses F and J replace health/eco tourism with cruise ship/houseboat services; IT/ITeS is restricted to data centres; add ropeways/amusement parks/rides; omit vocational/digital education, fintech/financial services, BPO and listed primary-healthcare/agriculture technology-oriented startup categories. Do not market these omitted categories as current UNNATI-eligible sectors. Clause G amends 8.10 to reference State Government schemes and expressly allows additional state top-up subject to disclosure of UNNATI benefits. Read with original 8.10; not blanket unlimited stacking. Clause E addresses same-GSTIN manufacturing expansion at another location within the same NE state and zone basis. Clause H addresses multiple GST registrations, ₹ 250 crore entity-in-state ceiling and 15% positive appraisal-value deviation subject to overall/budget limits. Amendment says effective from notification; reviewed text does not expressly resolve protection/transitional treatment of every earlier application/registration. Do not retrospectively deny vested earlier benefits. Review registration date, sanction and transition position individually.
Status. Applications closed 30 September 2026; 31 March 2027 is the registration-grant deadline, not a fresh application deadline.
Checked pages. English PDF pp 3-5, clauses B-J
Mo FPI identifies rice/spice resources
Documented industrial framework supplies a starting point for eligibility diligence.
Varietal consistency and seasonal procurement.
Flood exposure, river seasonality and interchange costs require site-specific modelling.
Mo FPI describes food infrastructure; packaging can serve contracted processors.
IWAI describes Pandu infrastructure and airport operator describes cargo facilities; select modes against actual bookings.
Route, climate and service disruption can affect delivered cost.
Publication of policy does not guarantee an open window or budget release.
Constraint. Varietal consistency and seasonal procurement.
Intervention. For specialty rice and spice ingredients, complete this investment gate before sizing/committing capacity: Crop contracts, food-safety testing and buyer approval.
Owner. Promoter procurement/technical team and contracted buyer; regulator or carrier where the gate requires clearance/service confirmation.
Opportunity. Specialty rice and spice ingredients
Prerequisite. Crop contracts, food-safety testing and buyer approval.
Residual risk. Demand and operating conditions may change; downside margins and contingencies remain necessary.
Classification. Analysis
Constraint. Input freight and weak order density.
Intervention. For guwahati-chaygaon packaging, complete this investment gate before sizing/committing capacity: Customer-specific annual demand and material landed cost.
Owner. Promoter procurement/technical team and contracted buyer; regulator or carrier where the gate requires clearance/service confirmation.
Opportunity. Guwahati-Chaygaon packaging
Prerequisite. Customer-specific annual demand and material landed cost.
Residual risk. Demand and operating conditions may change; downside margins and contingencies remain necessary.
Classification. Analysis
Constraint. Draft, schedules and border permissions.
Intervention. For pandu-linked consolidation, complete this investment gate before sizing/committing capacity: Door-to-door quotations and booked carriers.
Owner. Promoter procurement/technical team and contracted buyer; regulator or carrier where the gate requires clearance/service confirmation.
Opportunity. Pandu-linked consolidation
Prerequisite. Door-to-door quotations and booked carriers.
Residual risk. Demand and operating conditions may change; downside margins and contingencies remain necessary.
Classification. Analysis
Flood exposure, river seasonality and interchange costs require site-specific modelling.
Logistics/warehousing policy is listed in official EODB index; operative original and current rules remain a gap. No benefit rate or open application window asserted.
Current site title/lease/ownership, utilities, freight schedules/rates and buyer commitments require project diligence.
No current workforce/economy statistic asserted without a consistent dated primary series.
National FDI, tax, customs, environmental and sector approvals require the separate national legal guide.
Central policy, FDI, tax, customs, environment, workforce and remittance guide · Single canonical evidence repository
STARTUP POLICY · CHECKED 4 NOVEMBER 2026
New notified policy recovered; expressly cancels the February 2025 Startup and Innovation Policy. The displayed 2026 grant call closed on 3 October 2026.